SSA was hired to develop a masterplan for a synthetic turf football/soccer field and a 400m all-weather running track. The design also included new goal posts, pole vault runways, shot put and discus, long jump / triple jump runways, and high jump events.
SSA completed the project on time, with no change orders, and within the given construction budget.
SSA was the principal designer for the Facility, leading a consultant team and acquiring Division of the State Architect approval. The scope of work included Design Development, Construction Documentation, and Construction Administration for the Facility.